Civil Engineer Involved In Construction Requires 4800

A , 5800, and 5700 m3 of sand, fine gravel, and coarse gravel, respectively, for a building project. There are three pits from which these materials can be obtained. The composition of these pits is
A ,

How many cubic meters must be hauled from each pit in order to meet the engineer’sneeds?

Posted in Uncategorized